The Green Bank Bridge in Mullica Township will remain in the down position through the week of April 20 for repair and replacement of conduit and wiring affecting the operation of the span lock.
Motorists may continue to use the bridge, however, boats that normally require the bridge to be in the up/open position to pass through, will be unable to do so at this time.